730 RIVAIT Drive, Tilbury, Ontario
I just finished uploading this House for sale, 730 RIVAIT Drive, Tilbury, Ontario
New Build Hers & His Dream Lake House, located in Lighthouse Cove on Lake St Clair. The features are endless. Modern open concept main floor with nine foot ceilings and ceramic throughout. The open to above great room which has eighteen foot ceilings with a double sided fireplace feature wall and a wet bar with full fridge and dishwasher, perfect for entertaining. A large gourmet kitchen, with a full fridge full freezer, a second dishwasher, large apron sink, induction cooktop, indoor Wolf grill, pot filler, wall oven and convection microwave/oven combo. Large pantry, with space for a coffee bar. Plenty of storage with Cambria countertops. Large dinette which leads to a covered outdoor patio with an automatic screen wall to enjoy those misquote nights free from bites. Main floor includes a laundry with large guest room and three piece bath. Shower in its own room. Head upstairs to a second bedroom with private bath and a master bedroom you wont want to leave. Large master bedroom with a private wet bar and a balcony with views of the lake and the canal where you have your own private dock with a 20,000 lb boat lift and 100 amp service. The master bathroom with hers and his vanity and shower. Rain head showers and body jets, large soaker tub and private toilet room. Continue through to the dream walk-in closet complete with private laundry right in your closet. The house has a Sonos sound system throughout inside and out. His dream heated garage is 1,411 sqft with sixteen foot ceilings, two fourteen foot high garage doors, which makes it perfect to store all your toys, boat, RV, Transport truck, just to name a few and a third ten foot high garage door that leads out to the yard. Garage door openers, fireplace, in ceiling sonos speakers, porch fan, automatic screens, house and garage thermostats are all wifi capable. Concrete laneway and sidewalks to be installed early May. Irrigation system and sod to be completed by end of April. (id:2469)